- Overview
- Product Description
- Product Parameters
- Key Parts
- Detailed Photos
- Use For
- Our Service
Basic Info.
Packaging & Delivery
Product Description
Technical advantages of shenbao mold hot runner system:
1. Reduce the loss and cost of raw materials;
2. Reduce the recycling, sorting, crushing, drying and storage of waste, which can reduce the number of pulverizers, save labor, reduce energy consumption, and save production space;
3. Avoid the impact of using recycled materials on reducing the quality of parts;
4. Ensure the consistency of injection molded parts and improve the precision of plastic parts;
5. Increase the injection volume of the part and improve the compressibility of the plastic melt;
6. Strengthen the function of injection and improve the injection molding process;
7. Reduce the required injection and holding time;
8. Reduce the required clamping force;
9. Shorten the mold opening stroke in the injection operation cycle and eliminate the time spent taking out the nozzle material;
10. Shorten the injection cycle, strengthen automation and improve production efficiency.
2. Balanced runner design, uniform filling of parts cavity;
3. Appropriate specifications and sizes of hot nozzles ensure the smooth flow of the melt and the full filling of the cavity;
4. The gate structure and size are correct to ensure that the cavity is fully filled and the needle valve gate is closed in time. Thereby reducing casting and shortening injection molding cycle;
5. There is no dead zone in the flow channel, which ensures fast color change and prevents material degradation;
6. Minimize pressure loss;
Cavity | Bottle Preform | Mold | Mold Weight | Time(sec) | |||
Weight | Neck (mm) | Height (mm) | Width (mm) | Thick (mm) | |||
2(1*2) | 720 | 55 | 470 | 300 | 608 | 330 | 125 |
4(2*2) | 720 | 55 | 490 | 480 | 730 | 440 | 130 |
8(2*4) | 16 | 28 | 450 | 350 | 410 | 475 | 18 |
12 (2*6) | 16 | 28 | 600 | 350 | 415 | 625 | 18 |
16(2*8) | 21 | 28 | 730 | 380 | 445 | 690 | 22 |
24(3*8) | 28 | 28 | 770 | 460 | 457 | 1070 | 28 |
32(4*8) | 36 | 28 | 810 | 590 | 515 | 1590 | 28 |
48 (4*12) | 36 | 28 | 1070 | 590 | 535 | 2286 | 30 |
Valve pin | Heat insulation cap | Heat ring | Copper Nozzle |
Japan PUNCH | America DUPONT | Germany HOTSET | American PCT |
|
Installation service
When you finish the Preparation conditions, our fast and professional aftersales service engineer team will go to your factory to install the machine, give you the operating manual, and train your employee until they can operate the machine well.
The sample service
1. We can send you the video of the running machine.
2. You are welcome to come to visit our factory, and see the machine running.
Customized service
1. We can design the machines according your requirements(materil, power, filling type, the kinds of the bottles, and so on), at the same time we will give you our professional suggestion, as you know, we have been in this industry for many years.
After-sales service
1. We will delivery the machine and provide the bill of load on time to make sure you can get the machine quickly
2. When you finish the Preparation conditions, our fast and professional aftersales service engineer team will go to your factory to install the machine, give you the operating manual, and train your employee until they can operate the machine well.
3. We often ask feedback and offer help to our customer whose machine have been used in their factory for some time.
4. We provide one year warranty
5. Well-trained & experienced staff are to answer all your inquiries in English and Chinese
6.24 hours for engineer response (all services part 5days in customer hand by Intl' courier).
7.12 Months guarantee and life-long technical support.
8. Your business relationship with us will be confidential to any third party.
9. Good after-sale service offered, please get back to us if you got any questions.
Quality Control
We have the single quality department, that make sure the material of the raw materials is good, and ensure the machine running smoothly.
After all production, we will connect all the machines and keep running the full production line for at least 24 hours to ensure the stable running in customers' factory.
If you want to know more information about the product, You can send an inquiry, we will solve any of your problems and send you running vedio.
Related Products
Exhibition
COMPANY PROFILE
PACKAGING