Basic Info.
Model NO.
EK3-6E2
Computerized
Computerized
Certification
CE, ISO9001:2008
Productivity
13824 Pairs Per 24hours
Capacity
Depends on The Design
Raw Material
EVA
Certificate
CE
Transport Package
Container
Specification
ISO, CE
Trademark
KCLKA
Origin
Fujian, Jinjiang
HS Code
84771090
Production Capacity
20 Sets/ Month
Product Description
ITEM | EK3-6E2 | |
WORK STATION | 6 | |
CLAMPING FORCE | Ton | 180 |
MOULD PLATE SIZE | mm | (290*550)*2 |
MOULD HEIGHT | mm | 100-230 |
MOULD-OPENING STROKE | mm | 350 |
INJECTION SYSTEM | ||
INJECTOR | 2 | |
DIAMETER OF SCREW | mm | φ65 |
INJECTION CAP(MAX) | cc | 995 |
INJECTION PRESSURE | kg/cm | 0-130 |
INJECTION SPEED | cm/sec | 0-10 |
INJECTION SPEED OF SCREW | r*p*m | 0-190 |
TEMPERATURE CONTROL | section | 4 |
ELECTRICITY CONSUMPTION | ||
HEATER BARREL | kw | 9.8*2 |
HEATING PLATE | kw | 76.8 |
HYDRAULIC SYSTEM | kw | 51.9 |
VACUUM PUMP | HP | 1.5 |
COOLING FAN OF BARREL | HP | 1 |
TOTAL ELECTRICITY | kw | 148.3 |
OIL TANK SIZE | L | 800 |
MACHINE WEIGHT | kg | 26000 |
MACHINE WEIGHT | Meter | 8*4.5*3 |
Detailed Description :
Note:
1.Its product range includes EVA mid-soles,rainboots,slippers,sandals, clogs,sport protectors and various kinds of shoes and shoe accessories and depends on the EVA shoe mould.
2.The clamping force can be increased from 150 to 210 tons, according to your requirement.
3.The foam EVA injection molding machine is fully hydraulic and automatic operation except taking out product.
4.It is PLC controlled, its humanized parameter computer operation interface provide quick and exact terms of production.
Character:
1.Low operation height,Operation height in accord with human engineering
2.Extra height opening stroke
Act by fixed opening stroke: 350mm, which is not affected by any mould thickness changes and
3.available for 2plates mould,Mould thickness adjusting mechanism
Mould adjusting scope: 100-200MM
4.Rapid mould opening ,Act by toggle mechanism which opens the mould rapidly
5.Speedy injector movement
Driven by linear-track, allowing speedy moving and precise positioning,Energy saving design
6.No need water circulation for mould station
7.Space saving design,Put oil tank together with injection base, which makes the structure compact and saves more space.
Term:
All quotations are without value-added tax.
Delivery date:Within 60 days After receiving the 30% earnest money
Payment term: Advance payment at order 30%, 70% before shipment
Delivery State: Machines were taken apart and packed in suitable package that fits container shipping
For the machine experiment and installation, our technician will be sent to your
factory. And you are requested to afford the cost of their trip and payment .
Also Our technician will manage all the machine things for you and at the same time train your workers on how to use and maintain the machine.
Guarantee Time: One-year warranty and lifelong service. During guarantee period, the cost of any spare parts or new accessory should be borne by the seller, and the freight for delivery of spare parts will be on the buyer's account.
FAQ:
1.Can produce customized products?
We can produce customized products for you.
2.How to help when machine wrong?
We will send technicians to your factory maintenance.
3.why should you buy from us not from other suppliers?
Because We are the machine professional manufacturer in China.