Basic Info.
Model NO.
DYI00079
Application
Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware, Daily Commodity
Runner
Cold Runner
Design Software
UG
Installation
Mobile
Certification
TS16949, CE, ISO
Standard
HASCO
Customized
Customized
Number of Holes
1
Quality
High Quality
Package
Wooden Case Package According to Customer Require
Price Term
Fob CFR CIF Dat DDP EXW
Mould Life
100-5000K Shots
QC Machine
3D Measurement, Profile Projector
Mould Material
S136/2344/718/738/Nak80/P20 etc.
Mould Standards
Dme, Hasco, Fvtaba, Lkm and So on
Tool Machine
CNC, CNC-Wirecut, E.D.M, Milling, Grinding
Export Country
All Over The World
Transport Package
Plywood Case
Specification
According Client′ s Drawing or Sample
Trademark
yixun
Origin
China
HS Code
8480710090
Production Capacity
50 Sets / Month
Product Description
Double Colour Rotational Shot 2-shop Two-Shot Molding Injection Mold Moulding Mould
Two Shot Molding / Double Shot Moulding
Two Shot Molding / Double Shot Moulding
Product Description
main product | daily commodity wool combing bristle part with 2450 holes mirror polish mold and injection molding |
mould base | LKM,HASCO,etc |
Mould Material | s136/2344/718/738/NAK80/p20 etc. |
Moud Precision | +/-0.01mm |
Mould Life | 100k-5000K shots (depend on your requirement) |
Mould Cavity | Single cavity or multi-cavity |
Runner System | Hot runner or cold runner |
Gate Type | Pinpoint Gate, Edge Gate, Sub Gate, Film Gate, Valve Gate, Open Gate, etc. |
Equipment | High speed CNC, Standard CNC, EDM, Wire Cutting, WEDM, Grinder, Plastic Injection Molding Machine from 50-818T available. |
Plastic Material | PA6,PA66, ASA, POM, ABS,ABS+GF,ABS+PC,POM,PP, PE,PC,PMMA(Acrylic),TPE,TPU,PEI,PBT,PTFI |
Metal Material | pre-harden steel, heat treatment steel |
Surface Treatment | Polishing/smooth,texture/frosted, painting, plating, printing , etc. |
Pls Provide | 2D/3D drawing, samples |
Quanlity System | ISO 9001: 2015 |
Q:How about your quality control?
A:We have professional team to control mold quality, since we realize that quality control is the first priority to run business.
Q:What's your lead time?
A:For most mold, 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved.
Q:How long can i get the sample?
A:Depends on your specific items,within 3-7 days is required generally.
Q:What about after service?
A:Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help.