- Overview
- Product Description
- Detailed Photos
- Product Parameters
- Certifications
- Packaging & Shipping
- Installation Instructions
- FAQ
Basic Info.
Product Description
Machine features
Proportional oil system design,good stability,stable conversion,low failure rate,reliable ,easy to use and safe.
The whole machine body has sufficient rigidity,wear resistance,good guiding accuracy and stability.
Cooperate with the injection device to realize four-stage injection speed and injection pressure,and three-stage holding pressure.
It can meet the requirements of different rubber materials for injection conditions and has rapid production capacity.
Direct pressure structure with fast closing cylinder on both sides in vertical direction.
Two small oil cylinders to achieve fast opening and closing,speed and pressure divided into three digital settings;
The parallelism between upper and lower hot plates is less than 0.08mm.
A master cylinder to achieve clamping force,clamping pressure can be set.
Maximum closing pressure protection.
Precision electronic ruler controls the mode-locking stroke.
Low speed and low pressure controls protect mold safety settings until mold closing is in place.
Type | ZJBH-200T | ZJBH-300T | ZJBH-400T |
Injection volumn (cc) | 2500 | 4000 | 4000 |
Injection pressure (bar) | 1880 | 1800 | 1820 |
Clamping force (Ton) | 200 | 300 | 400 |
Heating plate dimension (mm) | 560*600 | 700*700 | 800*800 |
Opening stroke (mm) | 500 | 550 | 600 |
Minimum mold thickness (mm) | 60 | 60 | 110 |
Total power (kw) | 33 | 45 | 55 |
Machine size (m) | 3.5*1.7*2.7 | 3.7*1.8*3 | 5.7*1.8*3 |
Whole weight (Ton) | 7.5 | 9.5 | 12 |
Q1: Where is your factory located?
A1: Hunan Zhongjun Technology Co.,LTD is located at Jinlong High-tech industrial zone ,Yueyang City ,Hunan Province, China
A2: Yes, we can provide the complete solution line to customer according to customer's requirement.
Q3: How about the quality control in your factory?
A3: Zhongjun has the SOP (Standard Operation Procedure) and all the production step must follow up this SOP. Every machine needs at least automatic running over 48 to 72 hours and must be inspected carefully before shipment.
Q4: Will you offer the pre-sales service?
A4: Yes, we have an experienced pre-sales team to support customers not only including machine, technology also water .electrical, machine layout in factory, etc.
Q5: What about the after-service? Will you send your engineer to my country to help commission and install the machine?
A5: Surely, we have many experience technical engineers for oversea service, they would help you install machine and support training to workers also.
A6: Actually, the delivery time of the machines is depended on the machine options. Normally, the delivery time of standard machine could be within 20-50 days.
Q7 : What is the warranty of the machine ?
A7: The whole machine's warranty period is 12 months and key parts will be depended.
Q8 : Do you provide any spare parts with machine?
A8: Yes, Zhongjun will provide one set standard spare parts to customer according to different machines.